Alberta West now has 9-axle lowbedding capabilities. This is a 13 feet wide, 95,000 lb crane being moved to from Grande Prairie to NE of Chetwynd to install a bridge that will be used for preparation for the Site C dam..
Heavy equipment hauling across Canada. Excavator with a side grip pile driving unit going from Grande Prairie, Alberta to Roblin, Manitoba to fix a CN rail bridge in the flood area.
Alberta West Transport delivered this 120 foot bridge from Grande Prairie to Watson Lake. NWT. Alberta West truck then used its winch to pull the bridge across the river. Once in place the bridge deck was installed and project completed.